IMI’s fabrication group has provided another structure for the Oregon Torrefaction  project. Working with the  U.S. Endowment for Forestry and Communities, Inc. IMI Industrial Services Group has installed the balance of the work. Work included fabrication and installation of the IMI Biomass Dryer, 40,000 lb. Boiler and the Torrefaction system.

For more information

https://www.bluemountaineagle.com/news/how-torrefaction-works/article_2155c58e-f06d-11e9-a73d-eb471bfaee1c.html