IMI recently performed the demo of an entire tractor manufacturing line, and replaced the previous carbon steel railing with stainless steel.
The replacement rail was fabricated at our Structural Shop, based on the owner’s drawings and measurements, and installed by IMI employees onsite. The pans and hangers were formed by IMI’s Specialty Fabrication Shop.
IMI worked around the clock, day and night, for 60 hours straight to meet the owner’s deadline. Our ability to go above and beyond is evident in our work.